Warehouse Filings

How much does Tier II reporting cost per facility, with or without a filing service?

Warehouse Filings files Tier II for $950 a site a year, $750 from the third. RMA publishes $1,000 to $8,500 a project; EPA puts in-house work at $776; state fees for one warehouse run $0 to $700. There is no federal fee.

Updated November 24, 2026 ยท 47 sources listed at the end

Key facts
EPA's in-house estimate10.25 hours and $776.11 a year for a small non-manufacturing site (1 to 15 chemicals)
Federal feeNone
State fee, illustrative warehouse$0 to $700, median $45 (33 states computed)
Published consultant range$1,000 to $8,500 per project (RMA)
Our fee$950 per site, $750 per site from the third site

What EPA estimates a Tier II report costs in-house

EPA has to estimate the paperwork burden of every form it requires, and it publishes the math. Its June 2026 supporting statement for the Tier II information collection (EPA ICR 1352.19, OMB control number 2050-0072) puts a small non-manufacturing facility at 10.25 hours and $776.11 a year to take inventory and complete the Tier II form. EPA defines small as reporting 1 to 15 chemicals, which is where most warehouses sit.

EPA ICR 1352.19 supporting statement, Exhibit 2 (June 2026). Labor costs use BLS December 2025 rates: $86.80 an hour for managers and $72.10 for technical staff at non-manufacturers.
Facility type (EPA's size bands)Chemicals reportedHours per yearEPA's annual cost per facility
Non-manufacturer, small1 to 1510.25$776.11
Non-manufacturer, mediumUp to 8040.25$2,993.03
Non-manufacturer, largeMore than 8040.25$3,021.39
Manufacturer, small1 to 1514.25$1,096.28
Manufacturer, mediumUp to 8080.25$5,911.11

Those hours assume someone who already knows the rules and has the data in hand. EPA's own consultations found small facilities spending two to four hours on two to four chemicals, and it assumes no time for first-year rule reading at existing sites. Across all 471,787 respondents, including 3,052 state and local committees, EPA estimates 6,963,271 hours and $306.7 million a year. Federal Register, April 9, 2026.

State fees for a typical warehouse

There is no federal Tier II fee. State fees are where the bill differs most, because states charge per facility, per chemical, per extremely hazardous substance, by quantity, or not at all. To make them comparable we applied each state's published fee rule to one illustrative warehouse: one general warehouse (NAICS 493110), 40 employees, filing on time for calendar year 2026, reporting two chemicals: sulfuric acid in lead acid forklift batteries (an extremely hazardous substance, 7,260 lb on site) and diesel in a generator tank (11,900 lb).

For one illustrative warehouse reporting battery acid and generator diesel, state fees run from $0 to $700 across the 33 states whose fee rules we could read, with a median of $45. Of those, 9 charge nothing for that warehouse, and the highest are Maryland ($700), Wisconsin ($550), Florida ($400). The full table below shows the arithmetic for each state with its source, and each state page repeats it.

State fee for the illustrative warehouse described above, computed from each state's published fee rule as read on November 24, 2026. Local fees, if any, are not included. States missing from this table have no fee rule we could read on an official page this session; their state pages say so.
StateState feeHow it adds upSource
Alabama$0No state fee; Tier2 Submit .t2s file emailed to AL312@adem.alabama.gov = $0State source
Arkansas$60$50 (first reportable chemical, sulfuric acid) + $10 (second chemical, diesel fuel) = $60State source
Colorado$30$10 facility fee + $10 (sulfuric acid) + $10 (diesel fuel) = $30State source
Connecticut$0No state fee; free Hazconnect Tier II Manager filing = $0State source
Delaware$160$100 (sulfuric acid, EHS) + $60 (diesel fuel, hazardous chemical) = $160; under the $5,000 facility capState source
Florida$400Category C: 40 employees x $10 = $400 (between the $25 minimum and $2,000 maximum); E-Plan administrative charge in Florida = $0; total $400State source
Georgia$25No state fee + $25 E-Plan facility filing charge (E-Plan is required in Georgia) = $25State source
Hawaii$200$200 per facility x 1 facility = $200State source
Indiana$100One facility above federal thresholds, no chemical at 1,000,000 lb or more (max 11,900 lb) = $100State source
Kansas$50EHS total 7,260 lb (sulfuric acid) falls in 1 to 9,999 lb = $25; non-EHS hazardous chemical total 11,900 lb (diesel) falls in 10,000 to 99,999 lb = $25; $25 + $25 = $50State source
Kentucky$250Sulfuric acid is an EHS (40 CFR Part 355), so the facility is a Category Five Facility: flat $250. Diesel adds nothing. Total $250.State source
Louisiana$652 hazardous materials (sulfuric acid, diesel) falls in the 01 to 25 band = $65. 40 employees is over the 9-employee small-business limit, so the $25 small-business rate does not apply. Total $65.State source
Maine$275$100 registration + $100 sulfuric acid (EHS, Schedule A 1,000-9,999 lb) + $75 diesel (Schedule B 10,000-99,999 lb) = $275.State source
Maryland$700$100 application fee + $400 sulfuric acid (EHS, 7,260 lb falls in the 1,000 to 9,999 lb band; MDE range code 05) + $200 diesel (11,900 lb, range code 06 under MDE's table, and under 100,000 lb under COMAR) = $700, below the $1,000 cap.State source
Michigan$0No state fee = $0.State source
Minnesota$252 chemicals reported (sulfuric acid, diesel) falls in the one-to-nine band = $25.State source
Mississippi$25$0 state fee + $25 E-Plan facility filing fee (E-Plan is required in Mississippi) = $25.State source
Missouri$100$100 base fee; 2 substances is not more than three, so no $20 add-ons. Total $100.State source
Montana$0$0 state fee + $0 E-Plan charge (E-Plan is required, and its 2026 charge in Montana is $0) = $0.State source
New Mexico$252 chemicals falls in the 1 to 3 band = $25.State source
New York$0$0 state fee; E-Plan is not required in New York (a hard-copy report is accepted), so the E-Plan charge is not included = $0. Filing electronically through E-Plan would cost $25.State source
North Carolina$140$90 sulfuric acid (EHS) + $50 diesel (hazardous chemical) = $140; E-Plan is required but its 2026 charge in North Carolina is $0. Total $140.State source
Ohio$320$150 base + $20 diesel (hazardous chemical) + $150 sulfuric acid (EHS, which gets the $150 EHS fee instead of the $20) = $320, below the $2,500 facility capState source
Oklahoma$45$15 diesel (hazardous substance) + $30 sulfuric acid (EHS) = $45, well under the $1,000 per-company capState source
Pennsylvania$202 reportable chemicals (diesel, sulfuric acid) x $10 = $20 state feeState source
South Carolina$0$0 state fee + $0 E-Plan charge (South Carolina is on E-Plan's $0 list for the 2026 filing year) = $0State source
South Dakota$502 reportable chemicals (diesel, sulfuric acid) falls in the 1-3 chemical tier = $50State source
Tennessee$25$0 state fee + $25 E-Plan administrative charge (E-Plan is required in Tennessee) = $25State source
Texas$50NAICS 493110 is non-manufacturing (NAICS 42-92); 2 hazardous chemicals is 75 or less = $50State source
Utah$0$0 state fee; Tier2 Submit software and the UDEQ portal are free = $0State source
Washington$0$0 state fee; Tier Two Online is free = $0State source
Wisconsin$5502 fee-subject chemicals (diesel 11,900 lb + sulfuric acid 7,260 lb = 19,160 lb cumulative, under 100,000 lb) = WEM 1.04(7)(b) rate $550State source
Wyoming$0$0 state fee; the Wyoming Tier II Portal and Tier2 Submit are free = $0State source

The same figures are in the 50-state Tier II matrix (CSV), column profile_fee_usd.

What outside providers publish

Most Tier II providers do not publish prices. The ones that do, checked on their own pages on November 24, 2026:

Published prices only. Providers that quote privately are listed on the Tier II services comparison.
ProviderTypePublished priceSource
RMA (Resource Management Associates)Consulting firm$1,000 to $8,500 per Tier II project. Scenario ranges: $1,500 to $3,000 for a first-time small facility, $2,000 to $4,000 for an annual update at a mid-sized facility, $1,000 to $3,000 per facility in a multi-facility programRMA pricing page
ERA Environmental (ERA-EHS)SoftwareFrom $99 per emission unit per year, billed annuallyERA Tier II page
E-Plan (University of Texas at Dallas)Filing system$25 per facility for the 2026 filing year; $0 in Alaska, Florida, Iowa, Montana, North Carolina, South Carolina and Warren County, OhioE-Plan charge table
Warehouse FilingsDone-for-you filing$950 per site per year, $750 per site from the third site; state fees extraPricing

For the providers that quote on request, such as Encamp, J. J. Keller and Trinity Consultants, see Tier II services compared, which links each one's own description of what it does.

What an Annual WAIRE Report costs

For South Coast AQMD warehouses the second filing is WAIRE. Warehouse Filings charges $2,500 per warehouse per report year, and missed years cost the same. AQMD adds its own fees under Rule 316: $456.00 for each Annual WAIRE Report, plus $556.93 if it is filed late. Points not earned through actions can be paid as a mitigation fee of $1,000 per point plus 6.25% (Rule 2305 (d)(5)). None of the WAIRE consultants we checked on November 24, 2026 publishes a price; see WAIRE compliance help compared and WAIRE fees.

What pushes the cost up

  • The first year. Building the battery and chemical inventory from scratch takes longer than updating last year's file. EPA's burden numbers assume the inventory exists.
  • Missing safety data sheets. Without the battery SDS, the acid share has to be estimated. EPA used 30% of battery weight in its 2025 Allen Distribution order when no SDS was provided.
  • Chemical count. Per-chemical state fees add up, and so does the time: EPA's consultations found 35 to 80 minutes per chemical at small facilities.
  • Several states. Each facility files its own report in its own state's system, with that state's fields and fee rules.
  • Missed years. Past years need the old software year or the state's own route, and each year is a separate filing.

The cost of not filing

The federal maximum is $71,545 per section 312 violation for penalties assessed on or after January 8, 2025, and each day counts separately under 40 CFR 19.4 and 42 U.S.C. 11045. Settlements with warehouse operators have been lower but still several times the cost of filing: EPA settled with Allen Distribution for $28,152 in 2025 for battery acid left off three years of reports, and with Sherwood Food Distributors for $138,000 in EPCRA penalties in 2024 after late inventory reports and a delayed release notice. A 2024 EPA Region 4 release lists a $1,500 penalty for one late Tier II filing. See Tier II penalties for the full case list.

Worked example: one warehouse, three ways

Illustrative only. A single general warehouse that reports battery acid and generator diesel, filed on time:

Ohio chosen because its fee rule (OAC 3750-50-01) prices each chemical separately, which shows how state fees stack. Other states: see the table above.
RouteLabor or provider feeState fee (Ohio, for this profile)What you end up with
In-house, experienced staffAbout $776 in staff time, EPA's estimate for a small non-manufacturer$320A filed report, if the person knows the rules and the data is ready
Consultant at RMA's published range$1,500 to $3,000 for a first-time small facility$320A filed report and the consultant's working file
Warehouse Filings$950 for the first or second site$320Battery and chemical inventory, threshold review, filing, copies to the LEPC and fire department, filed copy and working file

Outsourcing does not move the legal duty. The owner or operator, or its officially designated representative, still certifies the report under 40 CFR 370.42. What you buy is the inventory work, the state-by-state filing and a record of how every number was reached.

Common questions

Is there a federal fee for Tier II reporting?

No. EPA charges no fee for Tier II. Fees, where they exist, are set by each state, and some local committees or fire departments charge their own.

How long does a Tier II report take to prepare?

EPA estimates 10.25 hours a year for a small non-manufacturing facility reporting 1 to 15 chemicals, and 40.25 hours for a medium one, in its June 2026 burden estimate (EPA ICR 1352.19). A first-year inventory takes longer.

What does it cost to outsource Tier II per facility?

Published prices are scarce. RMA publishes $1,000 to $8,500 per project, with $1,000 to $3,000 per facility in multi-facility programs. Warehouse Filings charges $950 per site, $750 from the third site. State fees are extra in every case.

Does outsourcing transfer our liability?

No. The owner or operator, or its officially designated representative, certifies each Tier II report under 40 CFR 370.42. A provider prepares and files; your company still signs.

What does a WAIRE filing service cost?

Warehouse Filings charges $2,500 per warehouse per report year. AQMD's own fee for each Annual WAIRE Report is $456.00 under Rule 316, plus $556.93 if late, and mitigation fees are $1,000 per point plus 6.25%.

We build the battery and chemical inventory, check every threshold and file in your state's system. $950 a site per year, $750 a site from the third site. State fees extra.

Get a quote