How does Tier II reporting work for a company with many sites?

Each facility files its own Tier II report by March 1, in the system of the state where it sits. A facility is one site or adjacent sites under the same owner or operator. Fees vary: some states charge per facility, while others cap the company total, such as Arizona at $500 a year. Warehouse Filings (this site) files every site in its own state system: $950 a site, $750 from the third.

Updated November 24, 2026 ยท 18 sources listed at the end

Key facts
ReportsOne per facility, in the system of the state where it sits
DueMarch 1 at every site, for the previous calendar year
ThresholdsApplied per facility, not across the company
Company caps, examplesArizona $500 per owner or operator a year; Missouri $10,000 per employer a year; Louisiana $2,000 per owner or operator

One report per facility

Tier II is filed facility by facility. Under 40 CFR 370.3 a facility is all buildings, equipment and structures on one site, or on contiguous or adjacent sites, owned or operated by the same person or by companies under common control. Buildings that share a yard are usually one facility. Buildings in different parks are separate facilities, each with its own threshold check, its own report and its own state system.

Thresholds are applied per facility. Extremely hazardous substances such as the sulfuric acid in forklift batteries are added up across every container at that facility, not across the company. A network with eight batteries in each of ten buildings has ten separate acid totals to compare against 500 lb.

Each state runs its own system

A company with sites in five states files in five systems. EPA's state page lists them: E-Plan in states such as Georgia and Tennessee, EPA's Tier2 Submit file in states such as Ohio and Utah, Hazconnect in states such as Illinois and Indiana, and state portals such as CERS in California, STEERS in Texas and PATTS in Pennsylvania. Logins, state facility IDs, payment methods and copy rules differ in each one. Our state pages list each system and fee with its source.

Fees that work at the company level

Most state fees are charged per facility or per chemical, but several states cap the total per company or charge the owner rather than the site. That changes the math for a multi-site operator.

Fee rules as published by each state, checked November 2026. Other states charge per facility or per chemical with no company cap.
StateHow multi-site fees workSource
Arizona$75 for the first facility report, $20 for each additional, up to $500 per owner or operator a yearAriz. Admin. Code R18-18-107
Colorado$10 per facility plus $10 per reportable chemical, capped at $1,000 for a reporting organization with multiple Colorado facilitiesCDPHE fee structure
FloridaCharged per owner or operator, not per facility, based on employees in the state: most facilities $10 per employee, $25 minimum, $2,000 maximumFlorida DEM compliance manual
KansasFee per facility by pounds reported, with a statutory cap of $3,000 per owner or operator a yearK.A.R. 28-65-4
Kentucky$40 or $250 per facility by category; one owner's facilities in the same county are capped at $250 in total106 KAR 1:081
Louisiana$65 to $255 per facility by number of materials, capped at $2,000 per owner or operator statewideLAC 33:V.10121
Maryland$100 per facility plus a per-chemical inventory fee, capped at $1,000 per owner or operator a year, combined with TRI feesMDE Community Right-to-Know Fund
Missouri$100 per facility plus $20 for each substance beyond three, capped at $10,000 per employer a yearRSMo 292.606
NevadaState Fire Marshal permit per facility, plus SERC fees and surcharges capped at $7,500 per company a yearNevada State Fire Marshal
New Mexico$25 per 3 chemicals per facility; fees for all of an owner's New Mexico facilities capped at $250NM DHSEM
Oklahoma$15 per hazardous substance and $30 per extremely hazardous substance, up to $1,000 per company a yearOklahoma DEQ
TexasUp to 3 non-manufacturing facilities with 24 or fewer chemicals each, same operator and IDs, can share one fee on one draft reportTCEQ RG-533

Keep one inventory method across sites

Most multi-site errors come from each building counting differently. One site lists sulfuric acid, the next lists the batteries, a third forgets the spares in the charging room. EPA accepts either form for batteries, but it asks that a facility describe a mixture the same way in its section 311 and 312 reports. A shared method makes year-over-year changes easy to explain when a state or LEPC asks.

A few practical rules we apply across a network: the same battery weight source for every truck model, the same SDS for the same product, maximum amounts taken from the busiest day at each site, and one record per facility that shows where every number came from.

What a network costs with us

$950 a site for the first two sites and $750 a site from the third, per year. Five sites come to $4,150 and ten sites to $7,900. State fees are extra and are paid by you to the state.

Worked example: a five-state 3PL network

Illustrative. A 3PL runs one warehouse in each of five states. Each building reports battery acid and generator diesel, and files on time. Five reports, five filing systems, five fee rules:

State fees from each state's published rule as read November 24, 2026, applied to one warehouse reporting battery acid and diesel. Our fee: $950 for the first two sites, $750 from the third.
SiteWhere it filesOur feeState fee
TexasSTEERS Tier II$950$50
OhioTier2 Submit file by email$950$320
PennsylvaniaPATTS$750$20
GeorgiaE-Plan$750$25
IndianaHazconnect$750$100
Total$4,150$515

All in, the network costs $4,665 a year: $4,150 to us and $515 to the five states. The cost guide has the same calculation for every state.

Common questions

Do two buildings across the street count as one facility?

If they are contiguous or adjacent and owned or operated by the same company, 40 CFR 370.3 treats them as one facility. Separate parks are separate facilities.

Can we file every site in one submission?

Some systems allow it. Hawaii's e-Permitting system takes several facilities in one submittal with the fee calculated per facility, and Ohio accepts one check with a facility summary list. Each facility still has its own report.

Do company caps apply across states?

No. Each cap in the table applies within that state only.