Warehouse Filings

Tier II reporting in New Mexico

New Mexico facilities file Tier II as a Tier2 Submit file by email by March 1 for the prior calendar year. The state fee is $25 per 3 chemicals, $250 cap. One state filing also reaches the local emergency planning committee and the fire department. Forklift battery acid counts toward the 500 lb threshold. A warehouse reporting that acid and generator diesel pays $25 in state fees.

Updated November 24, 2026 · 7 sources listed at the end

Key facts
DueMarch 1, report and payment
Where you fileTier2 Submit file by email
State fee$25 per 3 chemicals, $250 cap
Typical warehouse fee$25 (battery acid and diesel, filed on time)
LEPC and fire departmentCovered by state filing

Where and how to file in New Mexico

New Mexico Department of Homeland Security and Emergency Management (DHSEM), Hazardous Materials Program, for the State Emergency Response Commission runs Tier II for the state. EPA Tier2 Submit (.t2s) file emailed to HAZMAT@DHSEM.NM.gov (cloud link or USB by mail for large files); no .zip, PDF or paper; E-Plan not required.

EPA's state page, last updated May 28, 2026, gives these instructions for New Mexico:

New Mexico requires facilities to use Tier2 Submit. Facilities may send their submission electronically via email. Alternate submission methods are available for larger submissions. For more information, please visit the New Mexico Tier 2 webpage. A new version of Tier2 Submit is created around November of each year. Download the latest version of Tier2 Submit.

Fees in New Mexico

$25 per 3 chemicals per facility ($25 for 1-3, $50 for 4-6 ... $250 for 28 or more); fees for all NM facilities are added and capped at $250 total ($250 maximum per owner/operator on the fee report). Check or money order only, no invoices; government agencies exempt. The source reads: "FEE SCHEDULE PER FACILITY (MAXIMUM PAYMENT OF $250) 1 to 3 chemicals per facility $25.00" Fee source.

Late filing: Fines up to $5,000 may apply if the correct payment is not received by March 1; a check that cannot be matched to the facility makes the submittal late.

Deadline

March 1 annually (report and payment); the submittal is complete only when both the .t2s file and correct payment are received. Under federal rules the report is due on or before March 1 each year for the previous calendar year, so the report covering 2026 is due by March 1, 2027.

Copies to the LEPC and fire department

No, by default. New Mexico uses single-point submission to DHSEM; LEPC and fire department copies are needed only if those agencies keep their own local requirements.

State-specific requirements

Fields and attachments the state asks for

Other things to know

Also checked on November 24, 2026

  • New Mexico uses single-point submission: LEPC and fire department copies are needed only if those agencies keep their own local requirements. Source: dhsem.nm.gov
  • A submittal is complete only when both the electronic file and the correct payment are received. Source: dhsem.nm.gov

How to file in New Mexico, step by step

The steps a first-time filer follows, from the state's own instructions as read on November 24, 2026:

  1. Build the report in the current EPA Tier2 Submit software and create a .t2s submission (no .zip, PDF or paper). Source: dhsem.nm.gov
  2. Email the .t2s file to HAZMAT@DHSEM.NM.gov (cloud link or mailed USB if too large). Source: dhsem.nm.gov
  3. Complete the Annual Tier II Fee Report and mail it with a check or money order payable to NM Department of Homeland Security and Emergency Management by March 1, to PO Box 27111, Santa Fe, NM 87502. Source: dhsem.nm.gov
  4. Make sure the check can be matched to the facility name on the Tier II report, or the submittal counts as late. Source: dhsem.nm.gov

What a typical warehouse pays in New Mexico

Illustrative: one general warehouse (NAICS 493110), 40 employees, filing on time for calendar year 2026, reporting two chemicals: sulfuric acid in lead acid forklift batteries (an extremely hazardous substance, 7,260 lb on site) and diesel in a generator tank (11,900 lb). Applying the state's published fee rule, that warehouse pays $25 to the state for the year.

How it adds up: 2 chemicals falls in the 1 to 3 band = $25. Route assumed: EPA Tier2 Submit (.t2s) file emailed to HAZMAT@DHSEM.NM.gov plus a mailed check or money order with the fee report; New Mexico does not require E-Plan and gives no credit for E-Plan payments, so no $25 E-Plan charge. None beyond the profile.

Local fees, if any, are not included. Compare every state on what Tier II costs per facility. Fee rule: dhsem.nm.gov

Penalties in New Mexico

Fines of up to $5,000 may apply if the correct payment is not received by March 1, and an unmatched check makes the submittal late. Source: dhsem.nm.gov

Federal penalties apply everywhere: up to $71,545 per section 312 violation, each day counted separately. See Tier II penalties for warehouse cases.

Who to contact in New Mexico

New Mexico Department of Homeland Security and Emergency Management (DHSEM), Hazardous Materials Program, Tier II Reporting: email HAZMAT@DHSEM.NM.gov. Source: dhsem.nm.gov

To find your local emergency planning committee, use the state's official LEPC list.

What warehouses in New Mexico usually report

Most warehouse Tier II reports start with the sulfuric acid in lead acid forklift batteries. Sulfuric acid is an extremely hazardous substance, so the acid in every battery on site, spares included, is added up and compared to 500 lb. EPA says the consumer product exemption does not apply to forklift batteries. After that come diesel in generator and fire pump tanks, propane cylinders, and anhydrous ammonia in cold storage. The battery calculator and the threshold checker run the numbers.

Other states: New Jersey · New York · all states

Common questions

Does New Mexico charge a Tier II fee?

The state fee is $25 per 3 chemicals, $250 cap. Source: dhsem.nm.gov.

Where do I file Tier II in New Mexico?

EPA Tier2 Submit (.t2s) file emailed to HAZMAT@DHSEM.NM.gov (cloud link or USB by mail for large files); no .zip, PDF or paper; E-Plan not required.

Do I send copies to the LEPC and fire department in New Mexico?

No, by default. New Mexico uses single-point submission to DHSEM; LEPC and fire department copies are needed only if those agencies keep their own local requirements.

When is the New Mexico Tier II report due?

March 1 annually (report and payment); the submittal is complete only when both the .t2s file and correct payment are received. Under federal rules the report is due on or before March 1 each year for the previous calendar year, so the report covering 2026 is due by March 1, 2027.

Is there a late fee for Tier II in New Mexico?

Fines up to $5,000 may apply if the correct payment is not received by March 1; a check that cannot be matched to the facility makes the submittal late.

How much does a typical warehouse pay for Tier II in New Mexico?

$25 in state fees for one warehouse reporting battery acid and generator diesel, filed on time: 2 chemicals falls in the 1 to 3 band = $25. Local fees are not included.

Who do I contact about Tier II in New Mexico?

New Mexico Department of Homeland Security and Emergency Management (DHSEM), Hazardous Materials Program, Tier II Reporting: email HAZMAT@DHSEM.NM.gov.

We build the battery and chemical inventory, check every threshold and file in your state's system. $950 a site per year, $750 a site from the third site. State fees extra.

Get a quote