The federal timeline
A new warehouse does not wait for March 1 to have obligations. The clock starts when a hazardous chemical first reaches its threshold, which for a building with electric forklifts is often the day the battery fleet arrives.
| Trigger | What is due | Deadline | Rule |
|---|---|---|---|
| A hazardous chemical first reaches its Tier II threshold | Section 311 SDS or chemical list to SERC, LEPC and fire department | Within 3 months | 40 CFR 370.33(a) |
| An extremely hazardous substance reaches its threshold planning quantity, such as 1,000 lb of sulfuric acid | Section 302 emergency planning notice to SERC and LEPC, and a facility emergency coordinator | Within 60 days | 40 CFR 355.20 |
| Any chemical at or above threshold during the calendar year | First Tier II report for that year | March 1 of the following year | 40 CFR 370.40, 370.45 |
| The SERC, LEPC or fire department asks for Tier II information | Tier II information | Within 30 days | 40 CFR 370.45(b) |
A worked example
A new distribution center starts operating in June 2026 with 12 lead acid forklift batteries of about 2,000 lb each. At the roughly 30% acid share EPA used in a 2025 order, that is about 7,200 lb of sulfuric acid. It crosses the 500 lb Tier II threshold and the 1,000 lb threshold planning quantity on the day the batteries arrive. The section 302 notice is due within 60 days, the section 311 submission within three months, and the first Tier II report, covering 2026, by March 1, 2027.
The battery calculator runs the same math on your own fleet.
State first-year steps
Several states add their own first-year deadlines or need an ID before you can file at all. Ask early; some IDs take weeks.
| State | First-year requirement | Source |
|---|---|---|
| Texas | An Initial Tier II report, with a fee, within 90 days when a new facility begins operating or a new reportable chemical arrives | TCEQ timelines |
| Pennsylvania | Report a new hazardous material at reporting quantity within 5 business days: Initial Tier II, SDS and updated site plan | PA L&I, PATTS |
| Colorado | Amend the Tier II within 90 days if a new reportable chemical arrives after you filed | CDPHE FAQ |
| Alabama | A location-based Master ID on every EPCRA submission; EPA notes requests can take 7 to 14 business days | ADEM, state fields |
| Hawaii | A HEER-issued Hawaii Tier 2 Facility ID; new facilities must request one | Hawaii HEER letter |
| Utah | A Utah Tier 2 ID; facilities that never reported request one through the portal | UDEQ, Tier 2 |
| Wisconsin | A one-time $1,080 emergency planning notification fee per facility within 60 days of an EHS reaching its planning quantity, for operators with 10 or more FTEs in the state | Wis. Admin. Code WEM 1 |
| Oregon | Register in CHS Manager as a Reporting Facility or Business User | Oregon SFM, CHS Manager |
| New Jersey | An 11-digit NJ Facility Identification number from the CRTK program for the survey | NJDEP CRTK FAQ |
Moving into an existing building
The Tier II report covers the facility for the calendar year. If the building changed hands or operators during the year, both may have chemicals to report for their part of the year. Iowa says directly that when a facility is sold during the year, both parties may have to report the same facility. In states with permanent facility IDs, such as Utah, the ID stays with the address, not the company, so a new operator should get the ID from the old one or the state.
How we help a new site
We set up the battery and chemical inventory as the site opens, send the section 302 and 311 submissions on time, request state IDs, and file the first Tier II report. $950 a site per year, $750 a site from the third site.
Common questions
We opened in December. Do we file for that month?
Yes, if a chemical reached its threshold at any time during the calendar year. The first report covers that year and is due the following March 1.
Do we need the 302 notice for forklift batteries?
If the sulfuric acid across all batteries reaches 1,000 lb, its threshold planning quantity, yes. That is often two batteries.
When is the section 311 submission due for a new warehouse?
Within 3 months of a hazardous chemical first reaching its Tier II threshold. The SDS or chemical list goes to the state commission, the local committee and the fire department (40 CFR 370.33(a)).
We build the battery and chemical inventory, check every threshold and file in your state's system. $950 a site per year, $750 a site from the third site. State fees extra.
Get a quote- 40 CFR 370.33 (eCFR)
- 40 CFR 370.40 (eCFR)
- 40 CFR 370.45 (eCFR)
- 40 CFR 355.20 (eCFR)
- 40 CFR part 355, Appendix A (eCFR)
- EPA Region 3, Allen Distribution consent agreement
- EPA, State Tier II Reporting Requirements and Procedures
- TCEQ, Tier II reports and timelines
- PA L&I, Tier II and PATTS
- CDPHE, Tier II FAQ
- ADEM, state required fields
- Hawaii HEER, reporting year 2025 letter
- UDEQ, Tier 2
- Wis. Admin. Code ch. WEM 1
- Oregon SFM, CHS Manager
- NJDEP, CRTK FAQ
- Iowa DNR, Tier II guidance